Cleanup work at the facility, located within the 890-square mile Idaho National Laboratory http://www.inl.gov/ , began in 2005. So far, the recovery project has focused on excavating radioactive and hazardous wastes, repackaging the materials, then shipping them in trucks for permanent disposal at the Waste Isolation Pilot Plant in New Mexico.
Full Story: http://www.idahostatesman.com/531/story/132061.html